Qantas First Class menus

The tasting plate is the same as what is offered in long haul J.
I find if you cross reference many of the J/F menus you find multiple shared dishes with F having some different sauces or accompaniments but essentially the same dish.
QF did mention at last results they are investing in the F catering and service - I wonder if anyone on here has had any indication about the improvements?

Or will we consider this an "enhancement"
 
QF1 SYD SIN yesterday. I just had the steak as I ate a lot in the lounge prior, overcooked as expected but tasty.
My partner has a dairy free special meal loaded but the crew member serving us couldn't tell her what it was, if there was dessert, and then kept putting dairy based items out (like butter instead of the supplied margarine).
 

Attachments

  • 20251113_174134.jpg
    20251113_174134.jpg
    1.3 MB · Views: 65
  • 20251113_174152.jpg
    20251113_174152.jpg
    749 KB · Views: 64
  • 20251113_174205.jpg
    20251113_174205.jpg
    902.6 KB · Views: 53
  • 20251113_174156.jpg
    20251113_174156.jpg
    835.6 KB · Views: 61
  • 20251113_174140.jpg
    20251113_174140.jpg
    465.8 KB · Views: 59
DFW-SYD on QF8, A380 service:

IMG_9716.jpeg

IMG_9714.jpeg

IMG_9715.jpeg

IMG_9718.jpeg
 

Attachments

  • IMG_9716.jpeg
    IMG_9716.jpeg
    1.3 MB · Views: 13
  • IMG_9714.jpeg
    IMG_9714.jpeg
    1.3 MB · Views: 7
  • IMG_9715.jpeg
    IMG_9715.jpeg
    1.3 MB · Views: 9
  • IMG_9718.jpeg
    IMG_9718.jpeg
    2.6 MB · Views: 12
Flight was obviously VERY long but I easily slept over 10 hours straight so those beds in QF First are indeed amongst the most cozy and comfortable in the sky. Service was a bit lacklustre at first but got better once the crew got into the rhythm. I was very pleased to find the Pommery Louise (2006 vintage) still being served on this flight as it’s one of the better premium millesime champagnes in my view. I made this preference of mine very clear so that in the end, the friendly purser offered me a full bottle to take home which I greatly appreciated as it certainly isn’t a cheap one!

For my meals, I could not resist the Steak Sandwich to start though I would have preferred it rather as an option throughout the flight of which there was NOTHING offered at all. Chips or cookies are NOT good enough on a 17 hour flight and QF used to offer sandwiches etc. at least so that was a disappointment which simply felt stingy- as is the sole little caviar canapé instead of a proper First class caviar service.

As a main, I was intrigued by the Tex Mex option of braised beef cheek with tacos and was happy with this flavoursome option. Maybe a bit too small a portion but I made up for it with the excellent rhubarb tartlet and some ice cream for desert. Breakfast the next morning was rather underwhelming with the smoked salmon extremely fishy (and not in a good way!) and the bacon hard and dry. Not really QF’s best though the scrambled eggs were fluffy and nice as usually on their flights.

IMG_9719.jpeg

IMG_9720.jpeg

IMG_9721.jpeg

IMG_9722.jpeg

IMG_9726.jpeg
 
QF38 SIN-MEL 25/11.

Crew led by Brooke were incredibly, possibly the best I’ve had on Qantas. First cabin was 6/14 which certainly helped. Bollinger grand dame was the champagne on offer.

Menu was the same as the QF2 one posted in October.
I had the prawns and beef and both were excellent. Shame the flight was only 6h20.IMG_3708.jpegIMG_3709.jpegIMG_3710.jpeg
 
Following trials across various flights and routes over the last few months, I understand that from DEC25 F dining will become 'on demand' once more!
Do you know if this will be the launch of the new menu they outlined in August's results presentation ("investing in First service and catering") ? Theyve been quiet since then!
 
From October:
P1_AUS-SIN_OCT25
P1_SIN-LHR_SEP25

From November:
P12_94_USA-AUS_SEP25

I don't think cognac above VSOP is coming back 😭
 

Attachments

  • QF1 SYD-SIN October 2025-1.jpg
    QF1 SYD-SIN October 2025-1.jpg
    152 KB · Views: 43
  • QF94 LAX-MEL November 2025-wine.jpg
    QF94 LAX-MEL November 2025-wine.jpg
    922.3 KB · Views: 46
  • QF94 LAX-MEL November 2025-4.jpg
    QF94 LAX-MEL November 2025-4.jpg
    431.4 KB · Views: 44
  • QF94 LAX-MEL November 2025-3.jpg
    QF94 LAX-MEL November 2025-3.jpg
    305.4 KB · Views: 42
  • QF94 LAX-MEL November 2025-2.jpg
    QF94 LAX-MEL November 2025-2.jpg
    319.3 KB · Views: 43
  • QF94 LAX-MEL November 2025-1.jpg
    QF94 LAX-MEL November 2025-1.jpg
    239.8 KB · Views: 44
  • QF1 SIN-LHR October 2025-wine.jpg
    QF1 SIN-LHR October 2025-wine.jpg
    874.8 KB · Views: 43
  • QF1 SIN-LHR October 2025-4.jpg
    QF1 SIN-LHR October 2025-4.jpg
    442.2 KB · Views: 39
  • QF1 SIN-LHR October 2025-3.jpg
    QF1 SIN-LHR October 2025-3.jpg
    325.2 KB · Views: 36
  • QF1 SIN-LHR October 2025-2.jpg
    QF1 SIN-LHR October 2025-2.jpg
    327.7 KB · Views: 35
  • QF1 SIN-LHR October 2025-1.jpg
    QF1 SIN-LHR October 2025-1.jpg
    219.5 KB · Views: 35
  • QF1 SYD-SIN October 2025-wine.jpg
    QF1 SYD-SIN October 2025-wine.jpg
    888.5 KB · Views: 35
  • QF1 SYD-SIN October 2025-4.jpg
    QF1 SYD-SIN October 2025-4.jpg
    465.5 KB · Views: 32
  • QF1 SYD-SIN October 2025-3.jpg
    QF1 SYD-SIN October 2025-3.jpg
    332.6 KB · Views: 27
  • QF1 SYD-SIN October 2025-2.jpg
    QF1 SYD-SIN October 2025-2.jpg
    325.2 KB · Views: 29
Read our AFF credit card guides and start earning more points now.

AFF Supporters can remove this and all advertisements

Just reporting what she said. I didn’t ask or test dine on demand to be fair. I gave my order before departure. I was happy to eat then rest. Will post pics later.
 
Just reporting what she said. I didn’t ask or test dine on demand to be fair. I gave my order before departure. I was happy to eat then rest. Will post pics later.
Thanks, I was just wondering if they explained what it involved.
Sounds like it may more of a extended dining “window” rather than dine on demand or swap meal services
 
Thanks, I was just wondering if they explained what it involved.
Sounds like it may more of a extended dining “window” rather than dine on demand or swap meal services
Given the F meal service is almost always too slow Interested to see how/if QF do offer true dine on demand in F!

Prehaps less passengers to serve may make it a quicker service, although I think the real issue is staffing arrangements in the F cabin/galley.
 

Become an AFF member!

Join Australian Frequent Flyer (AFF) for free and unlock insider tips, exclusive deals, and global meetups with 65,000+ frequent flyers.

AFF members can also access our Frequent Flyer Training courses, and upgrade to Fast-track your way to expert traveller status and unlock even more exclusive discounts!

AFF forum abbreviations

Wondering about Y, J or any of the other abbreviations used on our forum?

Check out our guide to common AFF acronyms & abbreviations.
Back
Top