Isn't the timeline dictated by the 333 maintenance requirements not 787 arrival. I can't see Qantas putting those frames through another check.Not sure if that soon.
Albeit the first batch of 4 789s (along with the 8 78X and 12 regular 35Ks) was due to arrive in FY27 (so by June 2027) but Qantas is yet to be allocated any production slots on the 787 build sheets.