How difficult would that be? There’d be a market for that.
How difficult would that be? There’d be a market for that.
QRail has "only" been doing this since 2013.How difficult would that be? There’d be a market for that.
Problem is that investment is not that far below doing it properly for full 300+ operating speed HSR.couldn’t be some investment to upgrade tracks
Considering the basket case that has been Airport Rail (or extra runways, tunnels, pretty much anything being made in Vic), my crystal ball tells me that HSR would just be a disaster in the making. Guaranteed to be over budget, late and not fit for purpose when built.I think I will have been shoved in the furnace at the crematorium well before there is ever a HSR between Mel-Syd.
And if past performance is an indicator of the future, before there is an Airport train CBD to MEL.
Considering the basket case that has been Airport Rail (or extra runways, tunnels, pretty much anything being made in Vic), my crystal ball tells me that HSR would just be a disaster in the making. Guaranteed to be over budget, late and not fit for purpose when built.
I see the Victorian government has built new platforms for these new trains but didn’t build them long enough. Contractors are making a killing from all these screwups.
AFF Supporters can remove this and all advertisements

They rotate to face either direction, so maybe they are having a bet each way.Do the seats really all face sideways s shown?
I was making a booking this morning, and I was pleasantly shocked to see that NSW TrainLink has finally started allowing seat selection.
It's stated as "for an extra charge you can manually select your seat" however no extra fee was added when I selected a seat.
Just tried a dummy booking now and it looks like this:
View attachment 533644
If you don't select your own seat, the system still allocates seats in the same way as they have for years, being that it seems to fill up one carriage at a time, which is really not ideal from a passenger perspective.
