Ask The Pilot

  • Thread starter Thread starter NM
  • Start date Start date
  • Featured
I’ve always wondered, are any sorts of tests done when the plane is towed over to the gate which might discover the issue two hours before actual pushback? Or are these issues which genuinely occur at that point in time and couldn’t be discovered through running the start up at an earlier time?
Things might show up if you knew to look for them, but this is the only time that the aircraft is completely configured for flight, with all systems loaded/powered, cabin doors all shut and armed. Cabin powered up. The only way you could really replicate it is simply to do it all, including the start, a couple of hours out. And then you have to shut it all down, and you've done nothing to preclude an issue in the next departure sequence.

Many of the faults that do appear at this time are not physical, but sensor issues. Sometimes you can work around them (the MEL might give you an out). Occasionally a part needs replacing. But most common of all is the normal computer fix of turning it on and off. But that takes time.
 
Last edited:
Things might show up if you knew to look for them, but this is the only time that the aircraft is completely configured for flight, with all system loaded/powered, cabin doors all shut and armed. Cabin powered up. The only way you could really replicate it is simply to do it all, including the start, a couple of hours out. And then you have to shut it all down, and you've done nothing to preclude an issue in the next departure sequence.

Many of the faults that do appear at this time are not physical, but sensor issues. Sometimes you can work around them (the MEL might give you an out). Occasionally a part needs replacing. But most common of all is the normal computer fix of turning it on and off. But that takes time.
Thanks!

Yeah I was just wondering the cost of a full start up vs the many hours of delay. Another case today of the 63 to JNB returning to the gate, eventually taking off four hours late. And of course the impact for the forward schedule.

But I’m guessing the engineers (or bean counters) have weighed up the costs.
 
Elevate your business spending to first-class rewards! Sign up today with code AFF10 and process over $10,000 in business expenses within your first 30 days to unlock 10,000 Bonus PayRewards Points.
Join 30,000+ savvy business owners who:

✅ Pay suppliers who don’t accept Amex
✅ Max out credit card rewards—even on government payments
✅ Earn & transfer PayRewards Points to 10+ airline & hotel partners

Start earning today!
- Pay suppliers who don’t take Amex
- Max out credit card rewards—even on government payments
- Earn & Transfer PayRewards Points to 8+ top airline & hotel partners

AFF Supporters can remove this and all advertisements

Become an AFF member!

Join Australian Frequent Flyer (AFF) for free and unlock insider tips, exclusive deals, and global meetups with 65,000+ frequent flyers.

AFF members can also access our Frequent Flyer Training courses, and upgrade to Fast-track your way to expert traveller status and unlock even more exclusive discounts!

AFF forum abbreviations

Wondering about Y, J or any of the other abbreviations used on our forum?

Check out our guide to common AFF acronyms & abbreviations.
Back
Top