For one this was a planned timeline a decade ago so being on time is a solidly good thing.Riddle me this. The runway is done (painted, lights in and operating), the terminal built (“looks like it could already welcome planes”). Yet it’s still not due to open until 2026? Why.
I appreciate that air safety and certification etc takes time but that does seem to be a long time.
It could also be like metro phase 2, everything was looking like it was going ahead of schedule then suddenly slips a bit.
If thr airport truly became ready by mid to late 2025 I'd imagine they would look to alter the opening date.