Qantas source are reporting the first c check is done and also the former VH_EBV is back in active service for Sayegh Airlines.
and also the former VH_EBV is back in active service for Sayegh Airlines.
So they sold it to them, or are leasing it?
Interestingly, an airline of a similar name is listed as a failed project on Airline Update. Accurate site? Nothing noted in the UAE yet.
AFF Supporters can remove this and all advertisements
I am surprised they did not go for a 400 which has just been retired, VH-OJR
The -300 was probably significantly cheaper (it's been parked a while as well).
To acquire yes, to operate, probably not, hence my surprise.
How extensive / what is done during a C check?
Heavy checks
The following two checks are traditionally known as heavy checks. They are normally accomplished at the main maintenance base of the airline where specialized manpower, materials, tooling, and hangar facilities are available.
'C' check: This is an extensive check of individual systems and components for serviceability and function. It requires a thorough visual inspection of specified areas, components and systems as well as operational or functional checks. It is a high-level check that involves extensive tooling, test equipment, and special skill levels. 'C' checks remove the airplane from the revenue schedule for 3 to 5 days. The 'C' check includes the lower checks, i.e. 'A,' 'B,' and Daily checks.
Examples of 'C' check items:
• Visually check flight compartment escape ropes for condition and security
• Check operation of DC bus tie control unit
• Visually check the condition of entry door seals
• Operationally check flap asymmetry system
• Pressure decay check APU fuel line shroud
• Inspect engine inlet TAI ducting for cracks
• Operationally check RAT deployment and system 'D' check: This can also be referred to as the Structural check. It includes detailed visual and other non-destructive test inspections of the aircraft structure. It is an intense inspection of the structure for evidence of corrosion, structural deformation, cracking, and other signs of deterioration or distress and involves extensive disassembly to gain access for inspection. Special equipment and techniques are used. Structural checks are man-hour and calendar-time intensive. The 'D' check includes the lower checks, i.e. 'A,' 'B,' 'C,' and Daily checks. This check removes the airplane from service for 20 or more days. Examples of 'D' check items include:
• Inspect stabilizer attach bolts
• Inspect floor beams
• Detailed inspection of wing box structure
Variations
There are variations of block maintenance. One of those variations is called a phase check — don't be confused by the variety of names. The number of scheduled maintenance tasks for a large airplane like the 747 are extensive, and this is particularly true for the higher 'C' and 'D' checks. Their accomplishment can remove the airplane from service for several weeks. This is considered unacceptable as it defeats the concept of removing the airplane from service in small, manageable blocks. One solution is to divide these higher checks into segmented blocks or phases.
How extensive / what is done during a C check?
would have been funnier if it was on the beer you go on the plane![]()